| PCE, TCE, DCE, VC |
manufacturing
| Dechlorination Sequence | Sunnyvale, CA |
|
| PCE, TCE, DCE, VC |
DOE
| HRC Pilot Tested in Low Perm Soils | Golden, CO |
|
| Carbon Tetrachloride |
DoD
| Carbon Tetrachloride Treatment using HRC | MD |
|
| TCA, DCA |
manufacturing
| NFA Achieved Treating TCA, DCA | New York, NY |
|
| PCE, TCE, DCE |
DoD
| Dry Cleaning Operations at Navy Base | Long Beach, CA |
|
| TCE, DCE, VC |
Landfill
| Successful HRC Pilot Results in Full Scale | Duluth, MN |
|
| Perchlorate, Cr(VI), Freon-113 |
Ordnance Facility
| Successful Treatment of Perc, Chrome 6 and Freon | Hollister, CA |
|
| TNB, RDX, DNT, TNT, Nitrate |
DoD
| Explosives Treatment | Pueblo, CO |
|
| PCE, TCE, DCE, VC |
Dry Cleaner
| Iron Inhibition at Superfund Site | Kenai, AK |
|
| TCE, DCE, VC |
manufacturing
| Bedrock Application of HRC | VA |
|
| PCE, TCE, DCE, VC |
Dry Cleaner
| Closure Attained after HRC Injection | Arlington, TX |
|
| PCE, TCE, DCE, VC |
manufacturing
| Successful Application in Tight Clay Soils | Cookeville, TN |
|
| TCE, DCE, VC |
Industrial Site
| HRC Chosen Over Lactate | San Jose, CA |
|
| TCE, DCE, VC |
Landfill
| Cost Savings using HRC | Liggett, CA |
|
| PCE, TCE, DCE, VC |
manufacturing
| Nipper Tower Brownfield | Camden, NJ |
|
| PCE, TCE, DCE, VC |
Dry Cleaner
| HRC Excavation Backfill Applications | Salem, OR |
|
| TCE, DCE, VC |
manufacturing
| Bedrock Application Results in Rapid Reduction | Oconee County, SC |
|
| PCE, TCE, DCE |
manufacturing
| Superfund Brownfield | Grafton, MA |
|
| TCE, DCE, TCA, DCA |
manufacturing
| Brownfield No Further Action | St. Louis, MO |
|
| Freon 11, Freon 113 |
Drug Manufacturing
| Grid & Barrier Applications Reduce Freon | Los Osos, CA |
|
| PCE, TCE, DCE, VC |
Dry Cleaner
| Rapid Reduction Below MCLs | Bellevue, WA |
|
| PCE, TCE, DCE, VC |
Dry Cleaner
| Site Closure after Massive Influx | Kent, WA |
|
| PCE, TCE, DCE, VC |
Dry Cleaner
| DNAPL Reduction | Portland, OR |
|
| Dinoseb, dicamba |
Agriculture
| Pesticides Treatment | Independence, OR |
|
| Cr(VI) |
Industrial Site
| HRC Treats Hex Chrome | Grand Rapids, MI |
|
| TNT |
DoD
| Successful TNT Treatment | Point Pleasant, WV |
|
| TCA, DCA |
manufacturing
| High Increase in Biodegradation Rate | Brookfield, WI |
|
| Nitrate, DCP |
Agriculture
| Fertilizer Reduction in Groundwater | Vernalis, CA |
|
| PCE, TCE, DCE, VC |
manufacturing
| Grid & Barrier Reduce CVOCs Below Cleanup Goals | Dallas, TX |
|
| TCE, TCA, DCA DCE, VC |
manufacturing
| Complicated Site Geology | France |
|
| TCE, DCE, DCA |
manufacturing
| DNAPL Reduction to Closure | Europe |
|
| DCE, VC |
DOE
| Effects of Variable Injection Spacing | Largo, FL |
|
| TCE, Cr(VI) |
manufacturing
| Removal of Cr(VI) towards Closure | TN |
|
| PCE, TCE, DCE, VC |
Industrial Site
| Long-Term HRC Barrier Results | CA |
|
| PCE, TCE, DCE, VC |
manufacturing
| P&T Replacement using HRC | Sunnyvale, CA |
|
| PCE, TCE, DCE, VC |
manufacturing
| Cost Comparison to P&T | Santa Clara, CA |
|
| TCE, DCE, VC |
N/A
| Fast and Slow Releasing Substrate Comparison | Santa Clara, CA |
|
| TCE, DCE, VC |
manufacturing
| HRC Treatment in Low Permeability Soil | Livermore, CA |
|
| PCE, TCE, DCE, VC |
Dry Cleaner
| Cost Savings using HRC | Somers, CT |
|
| PCE, TCE, Dieldrin, DIMP |
DoD
| Rocky Mtn Arsenal | Commerce City, CO |
|
| TCE, DCE, VC |
manufacturing
| Complete Reductive Dechlorination at Boeing Facility | St. Louis, MO |
|
| TEX, heavy metals |
manufacturing
| Lab Tests to Treat TEX and Heavy Metals | Genk, Belgium |
|
| TCE, DCE, VC |
Aircraft Testing Facility
| Comparison of HRC, Veg Oil and Chitin | Seattle, WA |
|
| PCE, TCE, DCE, VC |
Industrial Site
| Reductive Dechlorination using HRC | Linden, NJ |
|
| TCE, DCE, VC |
Industrial Site
| Rapid Reduction at Brownfield Allows for Redevelopment | Wellston, MO |
|
| PCE, TCE, DCE, VC |
Airport
| Unique Application of HRC | Millville, NJ |
|
| PCE, TCE, DCE, VC |
manufacturing
| Bedrock Application of HRC | NJ |
|
| TCE, Freon |
manufacturing
| HRC Replaces DPE System | Mountain View, CA |
|
| PCE, TCE, TCA, DCE |
N/A
| Tidally Influenced Plume | Stratford, CT |
|
| TCA, TCE |
DoD
| Successful Pilot Test at DoD Site | Cherry Point, NC |
|